1
Neighbors for Wintersburg Wetlands Restoration
2
Increased Traffic Congestion
  • Graham Street already congested at peak periods
  • Congestion will be worsened by:
    • Marine View gym (in progress)
    • Parkside (proposed)
    • Hearthside/Fieldstone (proposed)
  • Circulation Alternative B needed to reduce the additional burden on Graham Street!
3
Restriping – a Fraudulent Mitigation
  • The EIR proposes left-turn median striping to mitigate Graham congestion
  • But drivers are already using a de-facto left-turn median of their own creation
  • So painting some extra lines in the middle of Graham won’t change anything!
  • How about conditioning for a traffic signal at Graham & Glenstone instead?
4
Increased Traffic Noise
  • Moderate traffic noise already from cars “punching it” on northbound Graham to get over the Wintersburg bridge
  • A signal at Parkside will cause the same kind of noise for southbound Graham
  • The EIR only discusses CNEL generalities without mentioning this traffic noise!
  • CNEL inaccurate due to stale traffic study



5
Left Turn Trouble at Kenilworth
  • Backups caused by the Parkside signal will create left turn delays when exiting Kenilworth onto northbound Graham
  • Southbound cars waiting at the signal will cause dangerous visibility problems
  • “Keep Intersection Clear” striping won’t solve the visibility problem
6
EIR Deficiencies – Traffic Data
  • Warner Ave data collected in 1994 and 1996
  • Graham Street data collected in 1996
  • Traffic counts that are 6-8 years stale do not accurately represent current traffic levels!
  • Some projected counts are dubious…
7
Omitted New Commercial Traffic
8
Omitted Marine View Enrollment Growth of 14%
9
Omitted Glenstone U-turn
10
No Marine View Drop-offs?
11
Graham & Glenstone Peak Traffic
Thursday, February 14, 2002, 7:35AM
12
Other Concerns
  • Slater Pump Station building permit and throttle-backs
  • Water quality impact of increased pumping
  • Shifting the flood risk
  • Fire station response times
  • Storm drain odors
  • Bolsa-Fairview earthquake fault
13
Accuracy Counts!
  • Invalid maps at study sessions
  • Missing sections from final EIR
  • Egregious typos (“4 miles to Marine View”)
  • Half-baked fire response testing
  • Stale, fantasy traffic data
  • Botched staff report distribution
  • Staff in denial regarding County permit requirements for Slater Pump Station
14
It’s Simply a Bad Project
with a Bad EIR!
  • Too many negative impacts on existing neighborhoods
  • Too many omitted impacts and non-mitigations in the very deficient EIR
  • A failure of vision not in keeping with the forward-looking city that Huntington Beach ought to be!