Shea Property Hydrology
Last updated February 18, 2002
Standing Water on the Property
This footage dates from December
1997 and shows the large areas of standing rainstorm water that collected
on this property prior to the land being recontoured by a bulldozer in the
absence of grading permits.
High 32.7MB
/ DSL 10.6MB
/ ISDN 4.7MB
/ Modem 1.4MB
Total running time: 6:20; video courtesy of Dean Albright.
Erosion of the Wintersburg Channel Walls
This footage dates from
April 24, 1998 and shows how the Wintersburg Channel wall adjoining the property
suffers from erosion. Shea is planning to improve their side of the
Wintersburg Channel by installing a massively tall concrete & steel wall
similar to that used for the Talbert Channel.
High 19.2 MB
/ DSL 6.2MB
/ ISDN 2.8MB
/ Modem 0.8MB
Total running time: 3:44; video courtesy of Dean Albright.
Slater Channel Pump Station
This footage dates from 1998 and shows the inflow and outflow of the Slater
Channel Pump Station. Parkside runoff will be diverted to the Slater
Channel Pump Station which will have one additional pump added. Note
how the Wintersburg Channel wall adjoining the Parkside property opposite
the Slater outflow is reinforced with concrete to be able to withstand
the Slater pump outflow.
High 26.3MB
/ DSL 8.5MB
/ ISDN 3.8MB
/ Modem 1.1MB
Total running time: 5:05; video courtesy of Dean Albright.
Webmaster: Mark Bixby