|
1
|
|
|
2
|
- 171 homes
- Increased urban runoff
- No on-site first-flush filtration or any other innovative water quality
measures
|
|
3
|
- Acquisition and re-integration with the Greater Bolsa Chica ecosystem
- Restoration of the wetlands, functioning as a natural treatment system
- Filtration of urban runoff that would otherwise flow into Huntington
Harbour
|
|
4
|
- Type I -- Offline
- Type II -- Inline
- Type III -- Co-located Within
Detention Basins
|
|
5
|
|
|
6
|
|
|
7
|
|